No access between Botany House and the grassed area adjacent to Great Hall 10th, 13th & 18th April

Where: 0006 Baines Wing, 0009 Botany House (13-15 Beech Grove Terrace) When: 10/04/2017 08:00 – 17:00, 13/04/2017 12:00 – 17:00 and 18/04/2017 08:00 – 17:00 Please bear with us as we are excavating and installing cable ducts & cable pull pit outside Botany House (13-15 Beech Grove Terrace) and the reinstatement of all paving. Services to […]

Road closure to Western Campus via Clarendon Road 01/04/2017

Please bear with us as we install a replacement chiller unit serving the Michael Marks Building, Western Campus. Services to be interrupted: Road closure to Western Campus via Clarendon Road between the hours of 08:00 – 16:30 Effects of this interruption upon building occupants: No Vehicle access to Western Campus. For enquiries please contact: Paul Thomas Contact Telephone […]

IT Services Electrical Shutdown

Where: IT Services and EC Stoner  When: 28/11/2016 – 02/12/2016 Effects of this interruption upon building occupants: Loss of 4 parking spaces adjacent to EC Stoner & IT Services  (opens new PDF) Reason for works/services interruption: Please bear with us as we locate a temporary generator for IT Services Electrical Shutdown.  Contact name responsible (to whom any queries […]

Part Closure of Piazza Area

Where: Part Closure of Piazza Area When: 18/11/2016 (06:00 – 10:00) Effects of this interruption upon building occupants: Pedestrian access may be restricted/diverted & traffic management in place. Unloading of vehicle on Beech Grove terrace. Reason for works/services interruption: For the safe pedestrian segregation while the installation of the Christmas tree takes place. (Crane Lift in operation). […]

Ground Investigation works for the International Centre Engineering and Physical Sciences

Geophysical survey by drilling boreholes using a hydraulic rig. Where: Electronic and Electrical Engineering, Central Boiler House, Chemistry and Chemistry West Block When: Wednesday 9th November 2016 – Friday 18th November 2016 Effects of this interruption upon building occupants: The works will produce some background noise nearby Chemistry and Chemistry West Block and Electronic and Electrical Engineering. Reason for works/services […]

Temporary loss of power – Garstang Building

Where: Garstang When: 18/10/2016 and 19/10/2016 (05:00 – 08:00) Effects of this interruption upon building occupants: There will be no power or lighting whilst the temporary generator is connected and then removed once the supplies have been transferred. Reason for works/services interruption: There will be a total loss of power affecting all mechanical and electrical […]

Restricted access to the rear of Parkinson Building 03/10/2016 – 07/10/2016

Where: Brotherton Library, Parkinson Building, Baines Wing, and Chemistry  When: 03/10/2016 – 07/10/2016 The service road and service areas between the rear of the Parkinson Building and the Brotherton Library will have restricted access between the 3 & 7 October 2016 to allow construction work to be undertaken for the installation of a new Lift to the Brotherton Library. Please […]

Worsley Building – Goods Lift No 61.

Where: Worsley Building – Goods Lift No 61. When: Thursday 6th October Effects of this interruption upon building occupants:  The lift will be out of operation for the duration of the works. Reason for works/services interruption: Installing new flooring Contact name responsible (to whom any queries should be directed):  Ian Stead Contact Telephone No. : 0113 […]

Installation of stone sculpture in front of Clothworkers South building

Where: Leeds University Union, Refectory, Clothworkers Building South When: Sunday 9th October 2016 Effects of this interruption upon building occupants: Noise as the existing stone sets are broken out, restricted access to vehicular movements during the works Reason for works/services interruption: Display of artwork on Campus Contact name responsible (to whom any queries should be directed): Chris […]

Display of Community Artwork across public areas on Campus

Where: Front of Michael Sadler Arches,  University Road & Western Campus – Parkinson, Michael Sadler, Botany House, Clothworkers Central, Psychology, Fine Arts & Charles Thackrah When: 06/10/2016 – 30/12/2016 Effects of this interruption upon building occupants: Presence of persons working from ladders installing yarns suspended from trees along University Road and Western Campus on Thursday 6th October. […]